“BEST POWER Adapter Charger replacement for HP Charger 18.5V 3.5A 65W 4.8*1.7MM– YELLOW PIN” has been added to your cart. View cart







HDMI Cable 30M BEST POWER HIGH SPEED Long Lead with Ethernet ARC 3D Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV Black & Gold Plated
$ 20.00 Original price was: $ 20.00.$ 18.00Current price is: $ 18.00.

BEST POWER DELUXE VGA to VGA cable, 5m , High-purity Copper Conductors (Full HD, VGA to VGA monitor cable & VGA lead, connects computers to screens/projectors, 15-pin D-Sub) – Blue & White
$ 7.00 Original price was: $ 7.00.$ 5.00Current price is: $ 5.00.
HDMI Cable 25M BEST POWER HIGH SPEED Long Lead with Ethernet ARC 3D Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV Black & Gold Plated
$ 18.00 Original price was: $ 18.00.$ 15.00Current price is: $ 15.00.
11
People watching this product now!
Description
Brand |
best power |
Connector type |
HDMI |
Cable type |
HDMI |
Compatible devices |
PS3, PS4, Xbox One, TVs, Projector, A/V Receivers, CCTV, Laptops, Monitors, PCs, Notebooks, Nvidia Shield, Apple TV, Amazon Fire TV, Sky HD, Sky Q (1080p), TiVo box, DVD & Blu-Ray Players and any device with an HDMI port.PS3, PS4, Xbox One, TVs, Projector, A/V Receivers, CCTV, Laptops, Monitors, PCs, Notebooks, Nvidia… |
About this item
-
[25 METER HDMI CABLE] – 82FT High Speed HDMI to HDMI Long Lead with Ethernet and ARC (Audio Return Channel). Finished with 24K gold plated connectors for flawless crisp signal transmission. Our award winning HDMI cables are designed in the UK.
-
[QUALITY MATERIALS] – Our HDMI cables are made to the highest standards. Featuring copper cable and double shielding to ensure smooth data transmission with no interference. Our long cables are ideal for extending your HDMI signal to other areas of the home or workplace. With a durable PVC jacket for easy routing in challenging areas
-
[WIDE COMPATIBILITY] – These cables are compatible with a range of devices that support HDMI. A perfect match for CCTV, Freeview/Freesat and Sky HD TV, PS4 & Xbox One Gaming Consoles, Blu-Ray & DVD Players, Home Cinema, AV Receivers, PC, Laptops, HDTV, Projectors. They are not compatible with Sky Q, PS4 Pro, Xbox One X and 4K Blu Ray Players when the resolution in set higher than 1080p.
-
[HIGH SPECIFICATION] – Packed with high specifications including Ethernet, CEC, 3D and ARC (Audio Return Channel) Support. Immersive HD surround sound audio including 5.1 & 7.1 Dolby Atmos and DTS X audio. High Resolutions from 720p, 1080i and 1080p at 60Hz. No picture degradation at longer lengths
-
[PREMIUM SERVICE] – Our cables have a 3-year extended warranty as standard and are individually inspected straight on the assembly line. We pride ourselves in providing high quality items and outstanding customer service.
Reviews (0)
Rated 0 out of 5
0 reviews
Rated 5 out of 5
0
Rated 4 out of 5
0
Rated 3 out of 5
0
Rated 2 out of 5
0
Rated 1 out of 5
0
Only logged in customers who have purchased this product may leave a review.
Shipping & Delivery
Our delivery fees are calculated based on the distance between our warehouse and your location. We strive to provide the best possible delivery experience for our customers, and we are committed to delivering your products as quickly and efficiently as possible. If you have any questions or concerns about our delivery services, please do not hesitate to contact us. Our customer service team is always available to assist you and provide any information or support that you may need. Thank you for choosing Haya Nails as your trusted technology partner
Related products
BEST POWER Adapter Charger replacement for DELL Charger 19.5V 3.34A 65W 4.0*1.7MM
BEST POWER Adapter Charger replacement for HP Charger 19.5V 4.62A 4.5*3.0mm – BLUE PIN
BEST POWER Adapter Charger replacement for Lenovo Charger 20V 3.25A 65W 5.5*2.5MM
BEST POWER Adapter Charger replacement for Toshiba Charger 19V 3.95A 75W 5.5×2.5mm
Lenovo S-03 Shockproof 5Gbps Portable USB 3.0 SATA HDD SSD Box 2.5 inch Hard Disk Drive External Mobile Case Enclosure
COMPUTER PARTS, Computer Cases, Enclosure, Storage Drives (SSD,HDD...), USB / TYPE C / Lightning Cables, ACCESSORIES, DESKTOP/LAPTOP, External Storage
Metal Stand For Laptop, Height Adjustable, With RGB Fans type C
COMPUTER PARTS, Fans & PC Cooling, ACCESSORIES, Laptop Cooling Pad / Stand, DESKTOP/LAPTOP, LAPTOP PARTS
RONGTA RP58E 58mm Thermal Receipt Printer Can Be Use For Money Counter Machine
OFFICE / POS, POS-ALL IN ONE PC, Printer Cables, Thermal Receipt Printer, ACCESSORIES, DESKTOP/LAPTOP, Money Counter, PRINTER / INK/ TONER
Rongta RP58E-U 58mm POS Thermal Receipt Printer is built in USB, Serial, Parallel interface and 8 dots/mm Print Resolution. In this thermal printer it has 100mm/sec print speed, 48mm Print Width, 58mm Paper width. The Print Resolution is 203 dpi it means it can print 8 dots/mm.
Brand: Rongta
Interface: USB
Print Speed: 100mm/sec
Resolution: 203 dpi
USB-C To Ethernet Adapter – USB 3.0 Type-C To Gigabit Ethernet (RJ45) Adapter – Up To 1000 Mbps, Compatible With Windows/Mac OS/Chrome OS, Black
CABLES-CONVERTORS, Converters, Ethernet Cables, NETWORK, Network Cards, ACCESSORIES, Office Keyboard & Mouse Combo, USB / TYPE C / Lightning Cables, COMPUTER PARTS, DESKTOP/LAPTOP, LAPTOP PARTS

Learn why IT Pros trust StarTech.com for performance connectivity accessories.
Reviews
Clear filtersThere are no reviews yet.