Beirut, Lebanon

+961 3 814 142

Beirut, Lebanon                   +961 3 814 142

PcMaclb
Login / Register
0 Wishlist
1
Menu
Login / Register
1
Browse Categories
  • MAIN
  • Money Counter
  • DESKTOP/LAPTOP
  • LAPTOPS
  • SCREEN/GAMING SCREEN
    • Monitor Arm
    • SCREEN 240HZ
    • SCREEN 165HZ
    • SCREEN 144HZ
    • SCREEN 75HZ
    • SCREEN 60HZ
  • PROJECTORS & TV
  • COMPUTER PARTS
    • Motherboards
    • CPUs / Processors
    • RAM
      • Desktop Ram
      • Laptop Ram
    • Pci-Pcie Cards
    • Storage Drives (SSD,HDD…)
    • GPU-Video Cards
    • PSU Power Supply
    • UPS
    • Computer Cases
    • Fans & PC Cooling
    • Dvd-Room Odd
    • CABLES-CONVERTORS
    • Power Cables
    • Enclosure
    • USB / TYPE C / Lightning Cables
    • Ethernet Cables
    • Extension Cables
    • HDMI Cables
    • Printer Cables
    • Vga Cables
    • Converters
  • External Storage
  • OFFICE / POS
    • POS-ALL IN ONE PC
    • Time Attendance Machine
    • Thermal Receipt Printer
    • Barcode lable printer
    • Barcode Reader
    • Bluetooth barcode lable printer
    • Cash drawer
    • Scale
    • Bluetooth printer
  • ACCESSORIES
    • Webcam
    • Thermal Paste-Pads
    • Mouse
    • Keyboard
      • Office Keyboard
      • Office Keyboard & Mouse Combo
    • Gaming/Pro Keyboard
    • Joystick
    • Chair-Gaming Chair
    • Headset
    • Mouse Pad
    • Speakers
    • Laptop Cooling Pad / Stand
    • Laptop Bag
    • Microphone
    • Mining Products
    • RGB Lighting Acc
  • LAPTOP PARTS
    • Laptop Adapters
    • Laptop Batteries
    • Laptop Keyboards
  • OPENBOX PRODUCTS
  • NETWORK
    • Switch
    • Modem Router DSL/VDS/Fiber
    • Range Extender
    • Network Cards
    • Routers
    • Network Tools
    • USB LAN/WIFI
“BEST POWER Adapter Charger replacement for HP Charger 19.5V 4.62A 4.5*3.0mm – BLUE PIN” has been added to your cart. View cart
-17%
Click to enlarge
Home CABLES-CONVERTORS HDMI Cables HDMI Cable 25M BEST POWER HIGH SPEED Long Lead with Ethernet ARC 3D Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV Black & Gold Plated
HDMI Cable 30M BEST POWER HIGH SPEED Long Lead with Ethernet ARC 3D Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV Black & Gold Plated
HDMI Cable 30M BEST POWER HIGH SPEED Long Lead with Ethernet ARC 3D Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV Black & Gold Plated $ 20.00 Original price was: $ 20.00.$ 18.00Current price is: $ 18.00.
Back to products
BEST POWER DELUXE VGA to VGA cable, 5m , High-purity Copper Conductors (Full HD, VGA to VGA monitor cable & VGA lead, connects computers to screens/projectors, 15-pin D-Sub) – Blue & White
BEST POWER DELUXE VGA to VGA cable, 5m , High-purity Copper Conductors (Full HD, VGA to VGA monitor cable & VGA lead, connects computers to screens/projectors, 15-pin D-Sub) – Blue & White $ 7.00 Original price was: $ 7.00.$ 5.00Current price is: $ 5.00.

HDMI Cable 25M BEST POWER HIGH SPEED Long Lead with Ethernet ARC 3D Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV Black & Gold Plated

$ 18.00 Original price was: $ 18.00.$ 15.00Current price is: $ 15.00.

  • best power 25M HDMI Cable HIGH SPEED Long Lead with Ethernet ARC 3D Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV  Black & Gold Plated

Compare
Add to wishlist
11 People watching this product now!
Categories: ACCESSORIES, CABLES-CONVERTORS, DESKTOP/LAPTOP, HDMI Cables, PROJECTORS & TV, SCREEN/GAMING SCREEN, Streaming-Tvbox
Share:
  • Description
  • Reviews (0)
  • Shipping & Delivery
Description

Brand

best power

Connector type

HDMI

Cable type

HDMI

Compatible devices

PS3, PS4, Xbox One, TVs, Projector, A/V Receivers, CCTV, Laptops, Monitors, PCs, Notebooks, Nvidia Shield, Apple TV, Amazon Fire TV, Sky HD, Sky Q (1080p), TiVo box, DVD & Blu-Ray Players and any device with an HDMI port.PS3, PS4, Xbox One, TVs, Projector, A/V Receivers, CCTV, Laptops, Monitors, PCs, Notebooks, Nvidia…

About this item

  • [25 METER HDMI CABLE] – 82FT High Speed HDMI to HDMI Long Lead with Ethernet and ARC (Audio Return Channel). Finished with 24K gold plated connectors for flawless crisp signal transmission. Our award winning HDMI cables are designed in the UK.

  • [QUALITY MATERIALS] – Our HDMI cables are made to the highest standards. Featuring copper cable and double shielding to ensure smooth data transmission with no interference. Our long cables are ideal for extending your HDMI signal to other areas of the home or workplace. With a durable PVC jacket for easy routing in challenging areas

  • [WIDE COMPATIBILITY] – These cables are compatible with a range of devices that support HDMI. A perfect match for CCTV, Freeview/Freesat and Sky HD TV, PS4 & Xbox One Gaming Consoles, Blu-Ray & DVD Players, Home Cinema, AV Receivers, PC, Laptops, HDTV, Projectors. They are not compatible with Sky Q, PS4 Pro, Xbox One X and 4K Blu Ray Players when the resolution in set higher than 1080p.

  • [HIGH SPECIFICATION] – Packed with high specifications including Ethernet, CEC, 3D and ARC (Audio Return Channel) Support. Immersive HD surround sound audio including 5.1 & 7.1 Dolby Atmos and DTS X audio. High Resolutions from 720p, 1080i and 1080p at 60Hz. No picture degradation at longer lengths

  • [PREMIUM SERVICE] – Our cables have a 3-year extended warranty as standard and are individually inspected straight on the assembly line. We pride ourselves in providing high quality items and outstanding customer service.

Reviews (0)
Rated 0 out of 5
0 reviews
Rated 5 out of 5
0
Rated 4 out of 5
0
Rated 3 out of 5
0
Rated 2 out of 5
0
Rated 1 out of 5
0

Reviews

Clear filters

There are no reviews yet.

Only logged in customers who have purchased this product may leave a review.

Shipping & Delivery
Our delivery fees are calculated based on the distance between our warehouse and your location. We strive to provide the best possible delivery experience for our customers, and we are committed to delivering your products as quickly and efficiently as possible. If you have any questions or concerns about our delivery services, please do not hesitate to contact us. Our customer service team is always available to assist you and provide any information or support that you may need. Thank you for choosing Haya Nails as your trusted technology partner

Related products

-17%
Compare

BEST POWER Adapter Charger replacement for ACER Charger 19V 3.42A 65W 3.0*1.0MM

LAPTOP PARTS, Laptop Adapters, DESKTOP/LAPTOP
$ 12.00 Original price was: $ 12.00.$ 10.00Current price is: $ 10.00.
Adapter Charger ACER Input 100-240V 50-60HZ Output 19V 3.42A Power 65W Plug Size 3.0×1.0mm
Add to wishlist
Add to cart
Quick view
-17%
Compare

BEST POWER Adapter Charger replacement for ACER Charger 19V 3.42A 65W 5.5*1.7MM–YELLOW PIN

LAPTOP PARTS, Laptop Adapters, DESKTOP/LAPTOP, Uncategorized
$ 12.00 Original price was: $ 12.00.$ 10.00Current price is: $ 10.00.
Adapter Charger ACER Input 100-240V 50-60HZ Output 19V 3.42A Power 65W Plug Size 5.5*1.7mm
Add to wishlist
Add to cart
Quick view
-17%
Compare

BEST POWER Adapter Charger replacement for DELL Charger 19.5V 4.62A 90W 7.4*5.0MM– BIG PIN

LAPTOP PARTS, Laptop Adapters, DESKTOP/LAPTOP
$ 12.00 Original price was: $ 12.00.$ 10.00Current price is: $ 10.00.
Adapter Charger DELL Input 100-240V 50-60HZ Output 19.5V 4.62A Power 90W Plug Size 7.4×5.0mm
Add to wishlist
Add to cart
Quick view
-17%
Compare

BEST POWER Adapter Charger replacement for HP Charger 19.5V 3.33A 4.5*3.0mm – BLUE PIN

LAPTOP PARTS, Laptop Adapters, DESKTOP/LAPTOP
$ 12.00 Original price was: $ 12.00.$ 10.00Current price is: $ 10.00.
AMPERAGE:
3.33A
CLASS:
Compatible
CONNECTOR TYPE:
Pin
VOLTAGE:
19.5V
Add to wishlist
Add to cart
Quick view
-17%
Compare

BEST POWER Adapter Charger replacement for LENOVO charger 20V 3.25A 65W 4.0*1.7MM

LAPTOP PARTS, Laptop Adapters, DESKTOP/LAPTOP
$ 12.00 Original price was: $ 12.00.$ 10.00Current price is: $ 10.00.
  Adapter Charger LENOVO Input 100-240V 50-60HZ Output 20V 3.25A Power 65W Plug Size 4.0×1.7mm
Add to wishlist
Add to cart
Quick view
-17%
Compare

BEST POWER Adapter Charger replacement for Toshiba Charger 19V 4.74A 90W 5.5×2.5mm

LAPTOP PARTS, Laptop Adapters, ACCESSORIES, DESKTOP/LAPTOP, LAPTOPS
$ 12.00 Original price was: $ 12.00.$ 10.00Current price is: $ 10.00.
Toshiba Adapter Charger Input 100-240V 50-60HZ Output 19V 4.74A Power 90W Plug Size 5.5×2.5mm
Add to wishlist
Add to cart
Quick view
-5%
Compare

GSAN GS-A4 POS System – All-in-One Touch 15.6″ – Intel Core i5 – 8GB – 128GB SSD | GS-A4

OFFICE / POS, POS-ALL IN ONE PC, DESKTOP/LAPTOP
$ 325.00 Original price was: $ 325.00.$ 310.00Current price is: $ 310.00.
  The features of GS-A4: tablet-like 15.6"capacitive touch screen, 16:9 screen ratio, simple design, exquisite appearance, with stable and firm metal  stand Panel: 15.6" capacitive touch panel, 16:9 Industrial grade panel OS: Windows 7/Windows 8/Windows 10/Windows 11
Add to wishlist
Add to cart
Quick view
-30%
Compare

Metal Stand For Laptop 14/ 15 /17.3 Inches

ACCESSORIES, Laptop Cooling Pad / Stand, DESKTOP/LAPTOP, LAPTOP PARTS, LAPTOPS
$ 10.00 Original price was: $ 10.00.$ 7.00Current price is: $ 7.00.
Metal Stand For Laptop Height Adjustable Over Heating Protection 10 – 17.3 inches Compact and Portable
Add to wishlist
Add to cart
Quick view

    Whole Sale Computer. We are an IT Distribution Company, Located in Lebanon

    Contact

    • Beirut, Lebanon
    • +961 3 814 142
    • sales@pcmaclb.com

    Links

    • Main
    • Shop
    • My account

    pos software in qatar     Cashier machines qatar

    Facebook Instagram Tiktok

    Pos Machines Supplier In Qatar

    © 2025 Created By Web Development Lebanon

    Close
    • MAIN
    • Money Counter
    • DESKTOP/LAPTOP
    • LAPTOPS
    • SCREEN/GAMING SCREEN
      • Monitor Arm
      • SCREEN 240HZ
      • SCREEN 165HZ
      • SCREEN 144HZ
      • SCREEN 75HZ
      • SCREEN 60HZ
    • PROJECTORS & TV
    • COMPUTER PARTS
      • Motherboards
      • CPUs / Processors
      • RAM
        • Desktop Ram
        • Laptop Ram
      • Pci-Pcie Cards
      • Storage Drives (SSD,HDD…)
      • GPU-Video Cards
      • PSU Power Supply
      • UPS
      • Computer Cases
      • Fans & PC Cooling
      • Dvd-Room Odd
      • CABLES-CONVERTORS
      • Power Cables
      • Enclosure
      • USB / TYPE C / Lightning Cables
      • Ethernet Cables
      • Extension Cables
      • HDMI Cables
      • Printer Cables
      • Vga Cables
      • Converters
    • External Storage
    • OFFICE / POS
      • POS-ALL IN ONE PC
      • Time Attendance Machine
      • Thermal Receipt Printer
      • Barcode lable printer
      • Barcode Reader
      • Bluetooth barcode lable printer
      • Cash drawer
      • Scale
      • Bluetooth printer
    • ACCESSORIES
      • Webcam
      • Thermal Paste-Pads
      • Mouse
      • Keyboard
        • Office Keyboard
        • Office Keyboard & Mouse Combo
      • Gaming/Pro Keyboard
      • Joystick
      • Chair-Gaming Chair
      • Headset
      • Mouse Pad
      • Speakers
      • Laptop Cooling Pad / Stand
      • Laptop Bag
      • Microphone
      • Mining Products
      • RGB Lighting Acc
    • LAPTOP PARTS
      • Laptop Adapters
      • Laptop Batteries
      • Laptop Keyboards
    • OPENBOX PRODUCTS
    • NETWORK
      • Switch
      • Modem Router DSL/VDS/Fiber
      • Range Extender
      • Network Cards
      • Routers
      • Network Tools
      • USB LAN/WIFI
    • Wishlist
    • Compare
    • Login / Register

    WhatsApp us