“BEST POWER Adapter Charger replacement for LENOVO charger 20V 3.25A 65W 4.0*1.7MM” has been added to your cart. View cart
HDMI Cable 15M BEST POWER HIGH SPEED Long Lead with Ethernet ARC 3D Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV Black & Gold Plated
$ 10.00 Original price was: $ 10.00.$ 9.00Current price is: $ 9.00.
GSAN GS-8360 Receipt Thermal Printer
$ 55.00 Original price was: $ 55.00.$ 48.00Current price is: $ 48.00.
HDMI Cable 10M BEST POWER HIGH SPEED Long Lead with Ethernet ARC 3D Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV Black & Gold Plated
$ 9.00 Original price was: $ 9.00.$ 7.00Current price is: $ 7.00.
-
Best Power 10M HDMI Cable HIGH SPEED Long Lead with Ethernet ARC 3D Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV Black & Gold Plated
4
People watching this product now!
Description
| Brand | best power |
| Connector type | HDMI |
| Cable type | HDMI |
| Compatible devices | PS3, PS4, Xbox One, TVs, Projector, A/V Receivers, CCTV, Laptops, Monitors, PCs, Notebooks, Nvidia Shield, Apple TV, Amazon Fire TV, Sky HD, Sky Q (1080p), TiVo box, DVD & Blu-Ray Players and any device with an HDMI port.PS3, PS4, Xbox One, TVs, Projector, A/V Receivers, CCTV, Laptops, Monitors, PCs, Notebooks, Nvidia… |
- 20m Standard Speed HDMI Cable with Ethernet
- HDMI Ethernet Channel
- Audio Return Channel
- 3D
- Compatible with all HD resolutions up to 1080p video format
- Expanded Support for Colour Spaces
- For connecting HD set top-boxes, DVD players, games consoles and all other HDMI AV equipment
Reviews (0)
Rated 0 out of 5
0 reviews
Rated 5 out of 5
0
Rated 4 out of 5
0
Rated 3 out of 5
0
Rated 2 out of 5
0
Rated 1 out of 5
0
Only logged in customers who have purchased this product may leave a review.
Shipping & Delivery
Our delivery fees are calculated based on the distance between our warehouse and your location. We strive to provide the best possible delivery experience for our customers, and we are committed to delivering your products as quickly and efficiently as possible. If you have any questions or concerns about our delivery services, please do not hesitate to contact us. Our customer service team is always available to assist you and provide any information or support that you may need. Thank you for choosing Haya Nails as your trusted technology partner
Related products
BEST POWER Adapter Charger replacement for DELL Charger 19.5V 3.34A 65W 4.0*1.7MM
BEST POWER Adapter Charger replacement for HP Adapter Charger 19V 4.74A 90W 7.4*5.0MM- BIG PIN
BEST POWER Adapter Charger replacement for LENOVO charger 20V 3.25A 65W 4.0*1.7MM
BEST POWER Adapter Charger replacement for Lenovo Charger 20V 3.25A 65W 5.5*2.5MM
BEST POWER Adapter Charger replacement for Toshiba Charger 19V 4.74A 90W 5.5×2.5mm
Metal Stand For Laptop, Height Adjustable, With RGB Fans type C
COMPUTER PARTS, Fans & PC Cooling, ACCESSORIES, Laptop Cooling Pad / Stand, DESKTOP/LAPTOP, LAPTOP PARTS
RONGTA RP58E 58mm Thermal Receipt Printer Can Be Use For Money Counter Machine
OFFICE / POS, POS-ALL IN ONE PC, Printer Cables, Thermal Receipt Printer, ACCESSORIES, DESKTOP/LAPTOP, Money Counter, PRINTER / INK/ TONER
Rongta RP58E-U 58mm POS Thermal Receipt Printer is built in USB, Serial, Parallel interface and 8 dots/mm Print Resolution. In this thermal printer it has 100mm/sec print speed, 48mm Print Width, 58mm Paper width. The Print Resolution is 203 dpi it means it can print 8 dots/mm.
Brand: Rongta
Interface: USB
Print Speed: 100mm/sec
Resolution: 203 dpi
USB-C To Ethernet Adapter – USB 3.0 Type-C To Gigabit Ethernet (RJ45) Adapter – Up To 1000 Mbps, Compatible With Windows/Mac OS/Chrome OS, Black
CABLES-CONVERTORS, Converters, Ethernet Cables, NETWORK, Network Cards, ACCESSORIES, Office Keyboard & Mouse Combo, USB / TYPE C / Lightning Cables, COMPUTER PARTS, DESKTOP/LAPTOP, LAPTOP PARTS

Learn why IT Pros trust StarTech.com for performance connectivity accessories.


Reviews
Clear filtersThere are no reviews yet.