Beirut, Lebanon

+961 3 814 142

Beirut, Lebanon                   +961 3 814 142

PcMaclb
Login / Register
0 Wishlist
1
Menu
Login / Register
1
Browse Categories
  • MAIN
  • Money Counter
  • DESKTOP/LAPTOP
  • LAPTOPS
  • SCREEN/GAMING SCREEN
    • Monitor Arm
    • SCREEN 240HZ
    • SCREEN 165HZ
    • SCREEN 144HZ
    • SCREEN 75HZ
    • SCREEN 60HZ
  • PROJECTORS & TV
  • COMPUTER PARTS
    • Motherboards
    • CPUs / Processors
    • RAM
      • Desktop Ram
      • Laptop Ram
    • Pci-Pcie Cards
    • Storage Drives (SSD,HDD…)
    • GPU-Video Cards
    • PSU Power Supply
    • UPS
    • Computer Cases
    • Fans & PC Cooling
    • Dvd-Room Odd
    • CABLES-CONVERTORS
    • Power Cables
    • Enclosure
    • USB / TYPE C / Lightning Cables
    • Ethernet Cables
    • Extension Cables
    • HDMI Cables
    • Printer Cables
    • Vga Cables
    • Converters
  • External Storage
  • OFFICE / POS
    • POS-ALL IN ONE PC
    • Time Attendance Machine
    • Thermal Receipt Printer
    • Barcode lable printer
    • Barcode Reader
    • Bluetooth barcode lable printer
    • Cash drawer
    • Scale
    • Bluetooth printer
  • ACCESSORIES
    • Webcam
    • Thermal Paste-Pads
    • Mouse
    • Keyboard
      • Office Keyboard
      • Office Keyboard & Mouse Combo
    • Gaming/Pro Keyboard
    • Joystick
    • Chair-Gaming Chair
    • Headset
    • Mouse Pad
    • Speakers
    • Laptop Cooling Pad / Stand
    • Laptop Bag
    • Microphone
    • Mining Products
    • RGB Lighting Acc
  • LAPTOP PARTS
    • Laptop Adapters
    • Laptop Batteries
    • Laptop Keyboards
  • OPENBOX PRODUCTS
  • NETWORK
    • Switch
    • Modem Router DSL/VDS/Fiber
    • Range Extender
    • Network Cards
    • Routers
    • Network Tools
    • USB LAN/WIFI
“BEST POWER Adapter Charger replacement for ACER Charger 19V 3.42A 65W 3.0*1.0MM” has been added to your cart. View cart
-20%
Click to enlarge
Home CABLES-CONVERTORS HDMI Cables HDMI Cable 20M BEST POWER HIGH SPEED Long Lead with Ethernet ARC 3D Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV Black & Gold Plated
HDMI cable PREMIUM 20M 4K 19+1 OD 7.0 UHD/HDR 2.0V – HIGH SPEED
HDMI cable PREMIUM 20M 4K 19+1 OD 7.0 UHD/HDR 2.0V – HIGH SPEED $ 22.00 Original price was: $ 22.00.$ 20.00Current price is: $ 20.00.
Back to products
HDMI Cable 15M BEST POWER HIGH SPEED Long Lead with Ethernet ARC 3D Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV  Black & Gold Plated
HDMI Cable 15M BEST POWER HIGH SPEED Long Lead with Ethernet ARC 3D Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV Black & Gold Plated $ 10.00 Original price was: $ 10.00.$ 9.00Current price is: $ 9.00.

HDMI Cable 20M BEST POWER HIGH SPEED Long Lead with Ethernet ARC 3D Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV Black & Gold Plated

$ 15.00 Original price was: $ 15.00.$ 12.00Current price is: $ 12.00.

 

BEST POWER HDMI CABLE 20M HI SPEED

Compare
Add to wishlist
5 People watching this product now!
Categories: ACCESSORIES, CABLES-CONVERTORS, DESKTOP/LAPTOP, HDMI Cables, LAPTOPS, PRINTER / INK/ TONER, PROJECTORS & TV, Streaming-Tvbox
Share:
  • Description
  • Reviews (0)
  • Shipping & Delivery
Description
  • Brand

    best power

    Connector type

    HDMI

    Cable type

    HDMI

    Compatible devices

    PS3, PS4, Xbox One, TVs, Projector, A/V Receivers, CCTV, Laptops, Monitors, PCs, Notebooks, Nvidia Shield, Apple TV, Amazon Fire TV, Sky HD, Sky Q (1080p), TiVo box, DVD & Blu-Ray Players and any device with an HDMI port.PS3, PS4, Xbox One, TVs, Projector, A/V Receivers, CCTV, Laptops, Monitors, PCs, Notebooks, Nvidia…

  • Description

  • 20m Standard Speed HDMI Cable with Ethernet

  • HDMI Ethernet Channel

  • Audio Return Channel

  • 3D

  • Compatible with all HD resolutions up to 1080p video format

  • Expanded Support for Colour Spaces

  • For connecting HD set top-boxes, DVD players, games consoles and all other HDMI AV equipment

Reviews (0)
Rated 0 out of 5
0 reviews
Rated 5 out of 5
0
Rated 4 out of 5
0
Rated 3 out of 5
0
Rated 2 out of 5
0
Rated 1 out of 5
0

Reviews

Clear filters

There are no reviews yet.

Only logged in customers who have purchased this product may leave a review.

Shipping & Delivery
Our delivery fees are calculated based on the distance between our warehouse and your location. We strive to provide the best possible delivery experience for our customers, and we are committed to delivering your products as quickly and efficiently as possible. If you have any questions or concerns about our delivery services, please do not hesitate to contact us. Our customer service team is always available to assist you and provide any information or support that you may need. Thank you for choosing Haya Nails as your trusted technology partner

Related products

-17%
Compare

BEST POWER Adapter Charger replacement for ACER Charger 19V 3.42A 65W 3.0*1.0MM

LAPTOP PARTS, Laptop Adapters, DESKTOP/LAPTOP
$ 12.00 Original price was: $ 12.00.$ 10.00Current price is: $ 10.00.
Adapter Charger ACER Input 100-240V 50-60HZ Output 19V 3.42A Power 65W Plug Size 3.0×1.0mm
Add to wishlist
Add to cart
Quick view
-17%
Compare

BEST POWER Adapter Charger replacement for LENOVO charger 20V 3.25A 65W 4.0*1.7MM

LAPTOP PARTS, Laptop Adapters, DESKTOP/LAPTOP
$ 12.00 Original price was: $ 12.00.$ 10.00Current price is: $ 10.00.
  Adapter Charger LENOVO Input 100-240V 50-60HZ Output 20V 3.25A Power 65W Plug Size 4.0×1.7mm
Add to wishlist
Add to cart
Quick view
-17%
Compare

BEST POWER Adapter Charger replacement for Toshiba Charger 19V 4.74A 90W 5.5×2.5mm

LAPTOP PARTS, Laptop Adapters, ACCESSORIES, DESKTOP/LAPTOP, LAPTOPS
$ 12.00 Original price was: $ 12.00.$ 10.00Current price is: $ 10.00.
Toshiba Adapter Charger Input 100-240V 50-60HZ Output 19V 4.74A Power 90W Plug Size 5.5×2.5mm
Add to wishlist
Add to cart
Quick view
-17%
Compare

Lenovo M120 Pro Wireless Mouse 2.4GHzInterface With USB Lightweight Ergonomic Optical Wireless Mouse For PC Or Laptop

ACCESSORIES, Mouse, Office Keyboard & Mouse Combo, DESKTOP/LAPTOP
$ 12.00 Original price was: $ 12.00.$ 10.00Current price is: $ 10.00.

Mouse Lenovo Original Wireless M120pro

Add to wishlist
Add to cart
Quick view
-11%
Compare

Metal Stand For Laptop, Height Adjustable, With RGB Fans type C

COMPUTER PARTS, Fans & PC Cooling, ACCESSORIES, Laptop Cooling Pad / Stand, DESKTOP/LAPTOP, LAPTOP PARTS
$ 28.00 Original price was: $ 28.00.$ 25.00Current price is: $ 25.00.
Metal Stand For Laptop Height Adjustable Dual-Core Turbo Radiator Supports 7 – 17 inches Compact and Portable
Add to wishlist
Add to cart
Quick view
-13%
Compare

RONGTA RP58E 58mm Thermal Receipt Printer Can Be Use For Money Counter Machine

OFFICE / POS, POS-ALL IN ONE PC, Printer Cables, Thermal Receipt Printer, ACCESSORIES, DESKTOP/LAPTOP, Money Counter, PRINTER / INK/ TONER
$ 40.00 Original price was: $ 40.00.$ 35.00Current price is: $ 35.00.
Rongta RP58E-U 58mm POS Thermal Receipt Printer is built in USB, Serial, Parallel interface and 8 dots/mm Print Resolution. In this thermal printer it has 100mm/sec print speed, 48mm Print Width, 58mm Paper width. The Print Resolution is 203 dpi it means it can print 8 dots/mm.
Brand: Rongta
Interface: USB
Print Speed: 100mm/sec
Resolution: 203 dpi
Add to wishlist
Add to cart
Quick view
-22%
Compare

USB 3.0 Gigabit Ethernet RJ45 LAN Network

CABLES-CONVERTORS, Converters, Ethernet Cables, Extension Cables, ACCESSORIES, Office Keyboard & Mouse Combo, USB / TYPE C / Lightning Cables, NETWORK, USB LAN/WIFI, COMPUTER PARTS, DESKTOP/LAPTOP, LAPTOP PARTS
$ 9.00 Original price was: $ 9.00.$ 7.00Current price is: $ 7.00.

USB 3.0 TO LAN ADAPTER GIGABIT

Add to wishlist
Add to cart
Quick view
-22%
Compare

USB-C To Ethernet Adapter – USB 3.0 Type-C To Gigabit Ethernet (RJ45) Adapter – Up To 1000 Mbps, Compatible With Windows/Mac OS/Chrome OS, Black

CABLES-CONVERTORS, Converters, Ethernet Cables, NETWORK, Network Cards, ACCESSORIES, Office Keyboard & Mouse Combo, USB / TYPE C / Lightning Cables, COMPUTER PARTS, DESKTOP/LAPTOP, LAPTOP PARTS
$ 9.00 Original price was: $ 9.00.$ 7.00Current price is: $ 7.00.
Product Performance
Learn why IT Pros trust StarTech.com for performance connectivity accessories.

USB-C to Gigabit Ethernet Adapter, Black, Thunderbolt 3 / 4 Compatible, Windows & Mac, RJ45 LAN Network Converter

Add to wishlist
Add to cart
Quick view

    Whole Sale Computer. We are an IT Distribution Company, Located in Lebanon

    Contact

    • Beirut, Lebanon
    • +961 3 814 142
    • sales@pcmaclb.com

    Links

    • Main
    • Shop
    • My account

    pos software in qatar     Cashier machines qatar

    Facebook Instagram Tiktok

    Pos Machines Supplier In Qatar

    © 2025 Created By Web Development Lebanon

    Close
    • MAIN
    • Money Counter
    • DESKTOP/LAPTOP
    • LAPTOPS
    • SCREEN/GAMING SCREEN
      • Monitor Arm
      • SCREEN 240HZ
      • SCREEN 165HZ
      • SCREEN 144HZ
      • SCREEN 75HZ
      • SCREEN 60HZ
    • PROJECTORS & TV
    • COMPUTER PARTS
      • Motherboards
      • CPUs / Processors
      • RAM
        • Desktop Ram
        • Laptop Ram
      • Pci-Pcie Cards
      • Storage Drives (SSD,HDD…)
      • GPU-Video Cards
      • PSU Power Supply
      • UPS
      • Computer Cases
      • Fans & PC Cooling
      • Dvd-Room Odd
      • CABLES-CONVERTORS
      • Power Cables
      • Enclosure
      • USB / TYPE C / Lightning Cables
      • Ethernet Cables
      • Extension Cables
      • HDMI Cables
      • Printer Cables
      • Vga Cables
      • Converters
    • External Storage
    • OFFICE / POS
      • POS-ALL IN ONE PC
      • Time Attendance Machine
      • Thermal Receipt Printer
      • Barcode lable printer
      • Barcode Reader
      • Bluetooth barcode lable printer
      • Cash drawer
      • Scale
      • Bluetooth printer
    • ACCESSORIES
      • Webcam
      • Thermal Paste-Pads
      • Mouse
      • Keyboard
        • Office Keyboard
        • Office Keyboard & Mouse Combo
      • Gaming/Pro Keyboard
      • Joystick
      • Chair-Gaming Chair
      • Headset
      • Mouse Pad
      • Speakers
      • Laptop Cooling Pad / Stand
      • Laptop Bag
      • Microphone
      • Mining Products
      • RGB Lighting Acc
    • LAPTOP PARTS
      • Laptop Adapters
      • Laptop Batteries
      • Laptop Keyboards
    • OPENBOX PRODUCTS
    • NETWORK
      • Switch
      • Modem Router DSL/VDS/Fiber
      • Range Extender
      • Network Cards
      • Routers
      • Network Tools
      • USB LAN/WIFI
    • Wishlist
    • Compare
    • Login / Register

    WhatsApp us