Beirut, Lebanon

+961 3 814 142

Beirut, Lebanon                   +961 3 814 142

PcMaclb
Login / Register
0 Wishlist
1
Menu
Login / Register
1
Browse Categories
  • MAIN
  • Money Counter
  • DESKTOP/LAPTOP
  • LAPTOPS
  • SCREEN/GAMING SCREEN
    • Monitor Arm
    • SCREEN 240HZ
    • SCREEN 165HZ
    • SCREEN 144HZ
    • SCREEN 75HZ
    • SCREEN 60HZ
  • PROJECTORS & TV
  • COMPUTER PARTS
    • Motherboards
    • CPUs / Processors
    • RAM
      • Desktop Ram
      • Laptop Ram
    • Pci-Pcie Cards
    • Storage Drives (SSD,HDD…)
    • GPU-Video Cards
    • PSU Power Supply
    • UPS
    • Computer Cases
    • Fans & PC Cooling
    • Dvd-Room Odd
    • CABLES-CONVERTORS
    • Power Cables
    • Enclosure
    • USB / TYPE C / Lightning Cables
    • Ethernet Cables
    • Extension Cables
    • HDMI Cables
    • Printer Cables
    • Vga Cables
    • Converters
  • External Storage
  • OFFICE / POS
    • POS-ALL IN ONE PC
    • Time Attendance Machine
    • Thermal Receipt Printer
    • Barcode lable printer
    • Barcode Reader
    • Bluetooth barcode lable printer
    • Cash drawer
    • Scale
    • Bluetooth printer
  • ACCESSORIES
    • Webcam
    • Thermal Paste-Pads
    • Mouse
    • Keyboard
      • Office Keyboard
      • Office Keyboard & Mouse Combo
    • Gaming/Pro Keyboard
    • Joystick
    • Chair-Gaming Chair
    • Headset
    • Mouse Pad
    • Speakers
    • Laptop Cooling Pad / Stand
    • Laptop Bag
    • Microphone
    • Mining Products
    • RGB Lighting Acc
  • LAPTOP PARTS
    • Laptop Adapters
    • Laptop Batteries
    • Laptop Keyboards
  • OPENBOX PRODUCTS
  • NETWORK
    • Switch
    • Modem Router DSL/VDS/Fiber
    • Range Extender
    • Network Cards
    • Routers
    • Network Tools
    • USB LAN/WIFI
“Lenovo S-03 Shockproof 5Gbps Portable USB 3.0 SATA HDD SSD Box 2.5 inch Hard Disk Drive External Mobile Case Enclosure” has been added to your cart. View cart
-33%
Click to enlarge
Home CABLES-CONVERTORS HDMI Cables HDMI Cable 1.5M BEST POWER HIGH SPEED Long Lead with Ethernet ARC 3D Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV Black & Gold Plated
HDMI Cable 3M BEST POWER HIGH SPEED Long Lead with Ethernet ARC 3D Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV Black & Gold Plated
HDMI Cable 3M BEST POWER HIGH SPEED Long Lead with Ethernet ARC 3D Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV Black & Gold Plated $ 5.00 Original price was: $ 5.00.$ 3.00Current price is: $ 3.00.
Back to products
HDMI Cable 30M BEST POWER HIGH SPEED Long Lead with Ethernet ARC 3D Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV Black & Gold Plated
HDMI Cable 30M BEST POWER HIGH SPEED Long Lead with Ethernet ARC 3D Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV Black & Gold Plated $ 20.00 Original price was: $ 20.00.$ 18.00Current price is: $ 18.00.

HDMI Cable 1.5M BEST POWER HIGH SPEED Long Lead with Ethernet ARC 3D Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV Black & Gold Plated

$ 3.00 Original price was: $ 3.00.$ 2.00Current price is: $ 2.00.

  • Best Power 1.5M HDMI Cable HIGH SPEED Long Lead with Ethernet ARC 3D Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV  Black & Gold Plated

Compare
Add to wishlist
10 People watching this product now!
Categories: ACCESSORIES, CABLES-CONVERTORS, DESKTOP/LAPTOP, HDMI Cables, PROJECTORS & TV, SCREEN/GAMING SCREEN, Streaming-Tvbox
Share:
  • Description
  • Reviews (0)
  • Shipping & Delivery
Description
Brand best power
Connector type HDMI
Cable type

HDMI

Compatible devices PS3, PS4, Xbox One, TVs, Projector, A/V Receivers, CCTV, Laptops, Monitors, PCs, Notebooks, Nvidia Shield, Apple TV, Amazon Fire TV, Sky HD, Sky Q (1080p), TiVo box, DVD & Blu-Ray Players and any device with an HDMI port.PS3, PS4, Xbox One, TVs, Projector, A/V Receivers, CCTV, Laptops, Monitors, PCs, Notebooks, Nvidia…

About this item

  • 1.5METER HDMI CABLE] – 10FT High-Speed HDMI to HDMI Long Lead with Ethernet and ARC (Audio Return Channel). Finished with 24K gold plated connectors for flawless and crisp signal transmission. Our award winning HDMI cables are designed in the UK.
  • [QUALITY MATERIALS] – Our HDMI cables are made to the highest standards. Featuring copper cable and double shielding to ensure smooth data transmission with no interference. Our long cables are ideal for extending your HDMI signal to other areas of the home or workplace. With a durable PVC jacket for easy routing in challenging areas
  • [WIDE COMPATIBILITY] – These cables are compatible with a range of devices that support HDMI. A perfect match for CCTV, Freeview/Freesat and Sky HD TV, PS4 & Xbox One Gaming Consoles, Blu-Ray & DVD Players, Home Cinema, AV Receivers, PC, Laptops, HDTV, Projectors. They are not compatible with Sky Q, PS4 Pro, Xbox One X and 4K Blu Ray Players when the resolution in set higher than 1080p
  • [HIGH SPECIFICATION] – Packed with high specifications including Ethernet, CEC, 3D and ARC (Audio Return Channel) Support. Immersive HD surround sound audio including 5.1 & 7.1 Dolby Atmos and DTS X audio. High Resolutions from 720p, 1080i and 1080p at 60Hz. No picture degradation at longer lengths
  • [PREMIUM SERVICE] – Our cables have a 3-year extended warranty as standard and are individually inspected straight on the assembly line. We pride ourselves in providing high quality items and outstanding customer service
Reviews (0)
Rated 0 out of 5
0 reviews
Rated 5 out of 5
0
Rated 4 out of 5
0
Rated 3 out of 5
0
Rated 2 out of 5
0
Rated 1 out of 5
0

Reviews

Clear filters

There are no reviews yet.

Only logged in customers who have purchased this product may leave a review.

Shipping & Delivery
Our delivery fees are calculated based on the distance between our warehouse and your location. We strive to provide the best possible delivery experience for our customers, and we are committed to delivering your products as quickly and efficiently as possible. If you have any questions or concerns about our delivery services, please do not hesitate to contact us. Our customer service team is always available to assist you and provide any information or support that you may need. Thank you for choosing Haya Nails as your trusted technology partner

Related products

-17%
Compare

BEST POWER Adapter Charger replacement for DELL Charger 19.5V 4.62A 90W 7.4*5.0MM– BIG PIN

LAPTOP PARTS, Laptop Adapters, DESKTOP/LAPTOP
$ 12.00 Original price was: $ 12.00.$ 10.00Current price is: $ 10.00.
Adapter Charger DELL Input 100-240V 50-60HZ Output 19.5V 4.62A Power 90W Plug Size 7.4×5.0mm
Add to wishlist
Add to cart
Quick view
-17%
Compare

BEST POWER Adapter Charger replacement for HP Charger 19.5V 3.33A 4.5*3.0mm – BLUE PIN

LAPTOP PARTS, Laptop Adapters, DESKTOP/LAPTOP
$ 12.00 Original price was: $ 12.00.$ 10.00Current price is: $ 10.00.
AMPERAGE:
3.33A
CLASS:
Compatible
CONNECTOR TYPE:
Pin
VOLTAGE:
19.5V
Add to wishlist
Add to cart
Quick view
-17%
Compare

BEST POWER Adapter Charger replacement for HP Charger 19.5V 4.62A 4.5*3.0mm – BLUE PIN

LAPTOP PARTS, Laptop Adapters, DESKTOP/LAPTOP
$ 12.00 Original price was: $ 12.00.$ 10.00Current price is: $ 10.00.
  • Power Input 100-250V 50-60HZ
  • 19.5V
  • 4.62A
  • 4.5*3.0mm
  • For HP Laptop
Add to wishlist
Add to cart
Quick view
-13%
Compare

BEST POWER Adapter Charger replacement for Lenovo-HP-ACER-DELL Charger 20V 3.25A 65W – TYPE C

LAPTOP PARTS, Laptop Adapters, DESKTOP/LAPTOP
$ 23.00 Original price was: $ 23.00.$ 20.00Current price is: $ 20.00.
Input: 100-240V 50-60Hz Output: 20V 3.25A 65W Connector size: Type C/USB C
Add to wishlist
Add to cart
Quick view
-18%
Compare

Lenovo M211 Wireless Mouse 2.4G Connection 1200DPI Easy Control Mice, Plug and Play, Efficient Wireless Connection, Ergonomic Design, for Laptop PC

ACCESSORIES, Mouse, Office Keyboard & Mouse Combo, DESKTOP/LAPTOP, LAPTOPS
$ 11.00 Original price was: $ 11.00.$ 9.00Current price is: $ 9.00.

 Lenovo M211 Wireless Mouse 2.4G Connection 1200DPI Easy Control Mice, Plug and Play, Efficient Wireless

Add to wishlist
Add to cart
Quick view
-11%
Compare

Metal Stand For Laptop, Height Adjustable, With RGB Fans type C

COMPUTER PARTS, Fans & PC Cooling, ACCESSORIES, Laptop Cooling Pad / Stand, DESKTOP/LAPTOP, LAPTOP PARTS
$ 28.00 Original price was: $ 28.00.$ 25.00Current price is: $ 25.00.
Metal Stand For Laptop Height Adjustable Dual-Core Turbo Radiator Supports 7 – 17 inches Compact and Portable
Add to wishlist
Add to cart
Quick view
-40%
Compare

Power Adapter 9V 1Amp 2.5mm PIN for Wifi Router- Label Printer Electric guitar Led strips Routers Modem CCTV cameras Black

LAPTOP PARTS, Laptop Adapters, NETWORK, Routers, Switch, ACCESSORIES, COMPUTER PARTS, DESKTOP/LAPTOP
$ 5.00 Original price was: $ 5.00.$ 3.00Current price is: $ 3.00.

Power Adapter 9V 1Amp 2.5mm PIN For WiFi Router

Add to wishlist
Add to cart
Quick view
-29%
Compare

USB 3.0 Hub 303 4 Port With 1.2m Cable , Portable Data Board For Smart Devices , Universal Compatibility , Transfer Speed Up To 5Gbps

CABLES-CONVERTORS, Converters, Extension Cables, ACCESSORIES, Office Keyboard & Mouse Combo, USB / TYPE C / Lightning Cables, COMPUTER PARTS, DESKTOP/LAPTOP, LAPTOP PARTS
$ 7.00 Original price was: $ 7.00.$ 5.00Current price is: $ 5.00.

USB Practical Simple Super Speed 3.0 Hub 4 Ports, Black 303

Add to wishlist
Add to cart
Quick view

    Whole Sale Computer. We are an IT Distribution Company, Located in Lebanon

    Contact

    • Beirut, Lebanon
    • +961 3 814 142
    • sales@pcmaclb.com

    Links

    • Main
    • Shop
    • My account

    pos software in qatar     Cashier machines qatar

    Facebook Instagram Tiktok

    Pos Machines Supplier In Qatar

    © 2025 Created By Web Development Lebanon

    Close
    • MAIN
    • Money Counter
    • DESKTOP/LAPTOP
    • LAPTOPS
    • SCREEN/GAMING SCREEN
      • Monitor Arm
      • SCREEN 240HZ
      • SCREEN 165HZ
      • SCREEN 144HZ
      • SCREEN 75HZ
      • SCREEN 60HZ
    • PROJECTORS & TV
    • COMPUTER PARTS
      • Motherboards
      • CPUs / Processors
      • RAM
        • Desktop Ram
        • Laptop Ram
      • Pci-Pcie Cards
      • Storage Drives (SSD,HDD…)
      • GPU-Video Cards
      • PSU Power Supply
      • UPS
      • Computer Cases
      • Fans & PC Cooling
      • Dvd-Room Odd
      • CABLES-CONVERTORS
      • Power Cables
      • Enclosure
      • USB / TYPE C / Lightning Cables
      • Ethernet Cables
      • Extension Cables
      • HDMI Cables
      • Printer Cables
      • Vga Cables
      • Converters
    • External Storage
    • OFFICE / POS
      • POS-ALL IN ONE PC
      • Time Attendance Machine
      • Thermal Receipt Printer
      • Barcode lable printer
      • Barcode Reader
      • Bluetooth barcode lable printer
      • Cash drawer
      • Scale
      • Bluetooth printer
    • ACCESSORIES
      • Webcam
      • Thermal Paste-Pads
      • Mouse
      • Keyboard
        • Office Keyboard
        • Office Keyboard & Mouse Combo
      • Gaming/Pro Keyboard
      • Joystick
      • Chair-Gaming Chair
      • Headset
      • Mouse Pad
      • Speakers
      • Laptop Cooling Pad / Stand
      • Laptop Bag
      • Microphone
      • Mining Products
      • RGB Lighting Acc
    • LAPTOP PARTS
      • Laptop Adapters
      • Laptop Batteries
      • Laptop Keyboards
    • OPENBOX PRODUCTS
    • NETWORK
      • Switch
      • Modem Router DSL/VDS/Fiber
      • Range Extender
      • Network Cards
      • Routers
      • Network Tools
      • USB LAN/WIFI
    • Wishlist
    • Compare
    • Login / Register

    WhatsApp us