-
Brand
best power
Connector type
HDMI
Cable type
HDMI
Compatible devices
PS3, PS4, Xbox One, TVs, Projector, A/V Receivers, CCTV, Laptops, Monitors, PCs, Notebooks, Nvidia Shield, Apple TV, Amazon Fire TV, Sky HD, Sky Q (1080p), TiVo box, DVD & Blu-Ray Players and any device with an HDMI port.
-
Description
“USB 3.0 Hub 303 4 Port With 1.2m Cable , Portable Data Board For Smart Devices , Universal Compatibility , Transfer Speed Up To 5Gbps” has been added to your cart. View cart
-20%









HDMI cable PREMIUM 20M 4K 19+1 OD 7.0 UHD/HDR 2.0V – HIGH SPEED
$ 22.00 Original price was: $ 22.00.$ 20.00Current price is: $ 20.00.

HDMI Cable 15M BEST POWER HIGH SPEED Long Lead with Ethernet ARC 3D Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV Black & Gold Plated
$ 10.00 Original price was: $ 10.00.$ 9.00Current price is: $ 9.00.
HDMI Cable 20M BEST POWER HIGH SPEED Long Lead with Ethernet ARC 3D Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV Black & Gold Plated
$ 15.00 Original price was: $ 15.00.$ 12.00Current price is: $ 12.00.
10
People watching this product now!
Description
Reviews (0)
Rated 0 out of 5
0 reviews
Rated 5 out of 5
0
Rated 4 out of 5
0
Rated 3 out of 5
0
Rated 2 out of 5
0
Rated 1 out of 5
0
Only logged in customers who have purchased this product may leave a review.
Shipping & Delivery
Our delivery fees are calculated based on the distance between our warehouse and your location. We strive to provide the best possible delivery experience for our customers, and we are committed to delivering your products as quickly and efficiently as possible. If you have any questions or concerns about our delivery services, please do not hesitate to contact us. Our customer service team is always available to assist you and provide any information or support that you may need. Thank you for choosing Haya Nails as your trusted technology partner
Related products
BEST POWER Adapter Charger replacement for DELL Charger 19.5V 4.62A 90W 7.4*5.0MM– BIG PIN
BEST POWER Adapter Charger replacement for HP Charger 18.5V 3.5A 65W 4.8*1.7MM– YELLOW PIN
BEST POWER Adapter Charger replacement for HP Charger 19V 4.74A 90W 4.8*1.7MM
BEST POWER Adapter Charger replacement for Toshiba Charger 19V 4.74A 90W 5.5×2.5mm
Lenovo M120 Pro Wireless Mouse 2.4GHzInterface With USB Lightweight Ergonomic Optical Wireless Mouse For PC Or Laptop
Metal Stand For Laptop, Height Adjustable, With RGB Fans type C
COMPUTER PARTS, Fans & PC Cooling, ACCESSORIES, Laptop Cooling Pad / Stand, DESKTOP/LAPTOP, LAPTOP PARTS
RONGTA RP58E 58mm Thermal Receipt Printer Can Be Use For Money Counter Machine
OFFICE / POS, POS-ALL IN ONE PC, Printer Cables, Thermal Receipt Printer, ACCESSORIES, DESKTOP/LAPTOP, Money Counter, PRINTER / INK/ TONER
Rongta RP58E-U 58mm POS Thermal Receipt Printer is built in USB, Serial, Parallel interface and 8 dots/mm Print Resolution. In this thermal printer it has 100mm/sec print speed, 48mm Print Width, 58mm Paper width. The Print Resolution is 203 dpi it means it can print 8 dots/mm.
Brand: Rongta
Interface: USB
Print Speed: 100mm/sec
Resolution: 203 dpi
USB-C To Ethernet Adapter – USB 3.0 Type-C To Gigabit Ethernet (RJ45) Adapter – Up To 1000 Mbps, Compatible With Windows/Mac OS/Chrome OS, Black
CABLES-CONVERTORS, Converters, Ethernet Cables, NETWORK, Network Cards, ACCESSORIES, Office Keyboard & Mouse Combo, USB / TYPE C / Lightning Cables, COMPUTER PARTS, DESKTOP/LAPTOP, LAPTOP PARTS

Learn why IT Pros trust StarTech.com for performance connectivity accessories.
Reviews
Clear filtersThere are no reviews yet.